Seawall Height in Broward: Common Questions
Seawall height in Broward is measured in feet above NAVD88, and the county floor is 5. Here are the questions people ask most, answered from the code itself.
Get your wall checked by a licensed contractor
What does NAVD88 mean?
It's the datum the codes measure from. A wall at 5 feet NAVD88 isn't 5 feet tall. Its top sits 5 feet above that reference.
NORTH AMERICAN VERTICAL DATUM (NAVD88). The vertical control for datum of orthometric height established for vertical control surveying in the United States of America based upon the General Adjustment of the North American Datum of 1988.
Hollywood Code Sec. 150.30 (Ord. O-2022-01), AmLegal. Source, pulled Nov. 21, 2026.
Is there a year when every wall must be raised?
No. The dates in the codes are about permits, and Hollywood plans to look at the number again.
§ 150.30 RESILIENCY STANDARDS FOR TIDAL FLOOD BARRIERS.
(A) Purpose and intent. The purpose of this section is to establish a consistent minimum elevation for tidal flood barriers that will:
(1) Provide a standard for tidal flood mitigation infrastructure that serves as a barrier to tidal flooding, not groundwater seepage, by accounting for water levels predicted under combined conditions of sea level rise, high tides, and high frequency (25-year return interval) storm surge through year 2070;
(2) Ensure new shoreline structures and major shoreline improvements are designed for use as tidal flood barriers through application of consistent standards that account for future predicted tidal flood conditions and coastal water levels associated with sea level rise in accordance with current sea level rise projections, as updated and adopted by the Broward County Board of Commissioners; and
(3) Re-evaluate the five feet NAVD elevation requirement in 2034 or before with consideration of updated sea level rise projections and models developed since adoption of this section to assess whether the minimum elevations set forth herein remain adequate to provide tidal flood mitigation.
Hollywood Code Sec. 150.30 (Ord. O-2022-01), AmLegal. Source, pulled Nov. 21, 2026.
2035 ends the 4 foot option for new applications. 2050 is the target for walls permitted at 4 feet. An untouched wall isn't on either clock.
Can a wall be too high?
In two cities, yes.
12. The top elevation of a new or modified tidal flood barrier shall not exceed the base flood elevation (BFE) as identified in the FEMA Flood Insurance Rate Map (FIRM) or six (6) feet NAVD88, whichever is lower. For properties within an X zone, the maximum tidal flood barrier elevation shall not exceed the natural elevation of the ground, as defined in subsection 47-2.2 (g)(1)(a); however, in the event of a conflict between Section 47-19.13.D.(1) of the ULDR and this sub-section, the requirements in Section 47-19.13.D.(1) of the ULDR shall govern.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
(A) All new or substantial repair or substantial rehabilitation of banks, berms, green-grey infrastructure, seawalls, seawall caps, upland stem walls, or other similar infrastructure shall be designed and constructed to perform as tidal flood barriers. Tidal flood barriers shall have a minimum elevation of five feet NAVD88 and shall not exceed an elevation of five feet ten inches NAVD88. Persons desiring to construct or repair a tidal flood barrier or rip-rap shall obtain all required permits and furnish a plan to the City Engineer for approval, which are prepared by an engineer licensed in the State of Florida, showing elevations, and proposed and adjacent seawalls referenced to North American Vertical Datum of 1988 (NAVD 88).
Pompano Beach Code Sec. 151.05 (Am. Ord. 2022-28), AmLegal. Source, pulled Nov. 21, 2026.
Does a beachfront wall count?
Property seaward of the coastal control line is left out of these sections.
B. This section applies to all new tidal flood barriers, substantial repair or substantial rehabilitation to shorelines and shoreline structures, the installation of any fixed structures attached to tidal flood barriers (such as mooring structures), and existing shorelines or shoreline structures that allow intrusion of tidal waters. This section is not applicable to oceanfront beaches or shorelines seaward of the Coastal Construction Control Line.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
COASTAL CONSTRUCTION CONTROL LINE (CCCL) or CONTROL LINE. The line established pursuant to F.S. § 163.053 and recorded in the official records of the county, which defines that portion of the beach-dune system subject to severe fluctuations based on a 100-year storm surge, storm waves, or other predictable weather conditions.
Hollywood Code Sec. 150.30 (Ord. O-2022-01), AmLegal. Source, pulled Nov. 21, 2026.
Does a new wall need rip-rap?
Usually, yes. The county text says so for every tidal flood barrier, and the cities word it their own way.
8. All vertical bulkheads or seawalls constructed in marine waters where no previous seawall existed shall be provided with natural limerock rip-rap, or other approved habitat enhancement, at the waterward face of the bulkhead or seawall.
Fort Lauderdale ULDR Sec. 47-19.13 (Ord. No. C-23-05), Municode. Source, pulled Nov. 21, 2026.
(7) All tidal flood barriers shall be faced with a minimum of one cubic yard per linear foot of natural limerock rip-rap, or other approved habitat enhancement, at the waterward face of the structure.
Hollywood Code Sec. 150.30 (Ord. O-2022-01), AmLegal. Source, pulled Nov. 21, 2026.
Who checks my wall?
A licensed marine contractor. We pass your request to one. We don't inspect, engineer or sign off on anything, and nothing here is legal advice. Start with the Broward County seawall requirements overview.